24nov 0 Another failed chinese Turbine – ANTARIS 6.5 kW is installed now Allgemein, NewsKeine Kommentare Another failed chinese Turbine was replaced in Poland, the ANTARIS 6.5 kW is installed now. The turbine is working 3-phased grid connected and everything is fine now for the customer. The Installation made our Partner in Poland: http://www.albedor.eu/ Teilen mit: Tweet Ähnliche Beiträge ANTARIS 6.5kW Share this Story