BRAUN Windturbinen GmbH

News & Aktuelles

Another Installation in Ireland

The Turbine is working on a 13 m lifting Pole, 1-phased grid connected with an ABB/PO 6.0 kW Inverter.
At the present there are 43 ANTARIS Windturbines working in IE.

Enjoy the wind with ANTARIS small Windturbines!

[cml_media_alt id='3698']IMG_3864[/cml_media_alt]

Ähnliche Beiträge

Share this Story