BRAUN Windturbinen GmbH

News & Aktuelles

New installation in Sceale Bay Australia

ANTARIS 2.5 kW on an 7.5 m custom designed Ambor Monopole tower.
The turbine is working 1-phased grid connected.

Enjoy the wind with ANTARIS small Windturbines!

Ähnliche Beiträge

Share this Story