BRAUN Windturbinen GmbH

Joy to the wind!

The ANTARIS 6.5 kW 3-phased grid connected on a 21 m high tubular tower in Lower Saxony / Germany.At that site a bat report could be dispensed, because it was the first site where a bat protection box was installed. Enjoy the wind!